The pentagonCorroshield was selected by the Pentagon after the 9/11 attack because we were the only company with a quick solution for green concrete covering. The contractor commissioned to rebuild the affected area had a mandate to rebuild the Pentagon as fast as possible.
Traditional epoxy flooring requires that newly poured concrete go through a 28 day setting time. Our solution requires only 24 hours. We enabled the re-construction of the Pentagon to happen in a timely manner. This was truly special to us.
|